New Orleans: Transportation planner sees merit in speeding up Canal streetcar service

By Bobby Evans, Contributing Opinion Writer, The Lens; March 22, 2019

 

The proposed pilot program to improve Canal streetcar performance is kicking up a lot of online pushback. In my view, the critics are shortsighted.

The Canal line, from the Cemeteries to the Riverfront, takes over half an hour to go 2.7 miles and is notoriously unreliable due to an excessive number of stops and right-of-way crossings. The pilot program would address this by closing 17 street crossings and eliminating around 30 stops to shave 12 to 15 minutes off the line’s full run. That may sound drastic, but it’s a common strategy in cities across the country. As a professional transportation planner, I see it as a positive move, one that will reduce travel time, increase reliability, and help the transit system overall.

Click here to read the full story.

Please share with others