From Progressive Railroading Magazine; March 14, 2018
Metra next month will replace 17,000 ties over a 17-mile single-track span along the Milwaukee District North Line.
The Chicago commuter railroad also will replace five switches, perform brush clearing and continue to upgrade the signal system in preparation for a positive train control (PTC) system.
Click here to read the full story.